Work it out.
Calculators
Takt time
Lean
OEE — overall equipment effectiveness
OEE (Nakajima)
Value-adding share (PCE)
Lean / Six Sigma
VEU allowance vs. wage costs
VEU-sats 2026 (uvm.dk / star.dk)
AMU participant fee for several employees
uvm.dk takstkatalog 2026
Meeting cost
Ratio arithmetic
Sickness absence percentage
Danmarks Statistik / DA-fraværsstatistik
Staff turnover
Ratio arithmetic
Cost of replacing an employee
SHRM-estimat (50-200 % af årsløn)
Competence gap scoring
Ratio arithmetic
Training budget allocated per course day
Forholdsregning (AMU-deltagerbetaling som dagspris)
Capacity for employee appraisals
Ratio arithmetic
Team size and span of control
McKinsey / Amazons 'two-pizza'-tommelfingerregel
OKR goal attainment
OKR-metoden (Doerr/Google)
Tools that work in all subjects
Whatever your programme is called, these tools calculate the same — Pythagoras, area, percentages and units are not tied to one trade.
- Pythagorasa² + b² = c²Find the missing side, set out a right angle, check whether a room is square, and find the space diagonal.
- Area and perimeterm²Rectangle, triangle, trapezium, circle and composite shapes — area and perimeter.
- Volume and surface aream³ · lBox, cylinder, cone, sphere, pyramid, prism, pipe and frustum — also in litres.
- Percent%Percentage of, how many per cent, percentage change, discount and VAT.
- Scale and ratios1 : 50From drawing to reality, area and volume to scale, the rule of three and dividing in a ratio.
- Unit convertermm ↔ mFrom mm to km, Pa to bar and kB to GB — with the unit staircase.
- Time calculations and the clockt : minTime between two clock times, add time, and 1.75 h = 1 h 45 min for the timesheet.
- Slope and fall% · ° · 1:xFall from level to level, in per cent, per mille, degrees and mm per metre — and the height difference.
- Material consumption including wastem² + %Boards, paint, battens at c/c spacing and packs — for a composite surface or a whole room, with waste.