Work it out.
Calculators
Sail area (mainsail)
Geometri (trekant)
Sailcloth and cloth consumption
Procent + enhedsomregning
Wood moisture
Træfugt (tørvægtsmetoden)
Epoxy mixing
Ratio arithmetic
Anchor chain length (scope)
Tommelfingerregel (ankerguide)
Fender sizing
Tommelfingerregel (fenderguide)
Scarf joint - scarf length
West System bådebygger-guide (8:1/12:1)
Glass fibre lamination - resin/glass ratio
Forholdsregning (glasindhold i laminat)
Antifouling paint - consumption
Producentdata (spredeevne - tjek datablad)
Displacement / buoyancy
Arkimedes' princip (fysik)
Sinkage when loading (TPC)
Skibsbygningsformel (TPC - vægt pr. cm synkning)
Block and tackle - mechanical advantage
Riggeregel (friktionstab pr. skive)
Rope - breaking strength
Empirisk riggeformel (D² × materialefaktor)
Shackle - working load
Empirisk riggeformel (SWL = 15·D², prøvelast = 35·D²)
Engine size for a displacement hull
Tommelfingerregel (motoreffekt pr. ton)
Bent bracket
Exact flat pattern
Screw conveyor flight
Approximate flat pattern
Flat plate, flange and blank
Exact flat pattern
Stair stringer
Exact flat pattern
Wheel arch repair panel
Exact flat pattern
Archimedean spiral
Exact flat pattern
Tools that work in all subjects
Whatever your programme is called, these tools calculate the same — Pythagoras, area, percentages and units are not tied to one trade.
- Pythagorasa² + b² = c²Find the missing side, set out a right angle, check whether a room is square, and find the space diagonal.
- Area and perimeterm²Rectangle, triangle, trapezium, circle and composite shapes — area and perimeter.
- Volume and surface aream³ · lBox, cylinder, cone, sphere, pyramid, prism, pipe and frustum — also in litres.
- Percent%Percentage of, how many per cent, percentage change, discount and VAT.
- Scale and ratios1 : 50From drawing to reality, area and volume to scale, the rule of three and dividing in a ratio.
- Unit convertermm ↔ mFrom mm to km, Pa to bar and kB to GB — with the unit staircase.
- Time calculations and the clockt : minTime between two clock times, add time, and 1.75 h = 1 h 45 min for the timesheet.
- Slope and fall% · ° · 1:xFall from level to level, in per cent, per mille, degrees and mm per metre — and the height difference.
- Material consumption including wastem² + %Boards, paint, battens at c/c spacing and packs — for a composite surface or a whole room, with waste.