Calculators
Earth volume
Grid method (bilinear surface)
Sewer fall
EBAI booklet on drainage plans (2009) based on DS 432
Fall away from the house
Danish Safety Technology Authority / SBi: 1:40, with hard paving 1:50, 3 m out
Stabilised gravel and bedding layer
Geometri + rumvægt
Fall on paving
Procent/promille
Concrete – mix quantities
Ratio arithmetic
Rebar – weight per metre
Massefylde for stål (DS/EN 10080)
Sewer pipe fall – minimum fall for drain pipe
DS 432 (Norm for afløbsinstallationer)
Soil bulking during excavation
Opsvulmningsfaktorer (EngineeringToolbox / ProjectEngineer.net)
Slope batter for excavation
AT-vejledning om bygge- og anlægsarbejde (VEJ nr. 10135 af 01/10/2026), kap. 5 om gravearbejde
Frost-free foundation depth
Bygningsreglementet BR18 §342
Jointing sand for paving
Geometri + producentdata (Dansand)
Number of paving stones per m²
Geometry
Kerb foundation – concrete quantity
Vejregler – AAB Brolægning (Vejdirektoratet, VD 2017-0005)
Ramp – gradient for step-free access
BR18 – adgangsforhold (bygningsreglementet §§ 48-62)
Soakaway – sizing rainwater infiltration
Tommelfingerregel (Bolius' faskine-guide)
Pad foundation – concrete quantity
Geometry
Concrete mixer – number of batches
Producentdata (jem & fix, 125 L betonblander)
Rafter template
Exact flat pattern
Tools that work in all subjects
Whatever your programme is called, these tools calculate the same — Pythagoras, area, percentages and units are not tied to one trade.
- Pythagorasa² + b² = c²Find the missing side, set out a right angle, check whether a room is square, and find the space diagonal.
- Area and perimeterm²Rectangle, triangle, trapezium, circle and composite shapes — area and perimeter.
- Volume and surface aream³ · lBox, cylinder, cone, sphere, pyramid, prism, pipe and frustum — also in litres.
- Percent%Percentage of, how many per cent, percentage change, discount and VAT.
- Scale and ratios1 : 50From drawing to reality, area and volume to scale, the rule of three and dividing in a ratio.
- Unit convertermm ↔ mFrom mm to km, Pa to bar and kB to GB — with the unit staircase.
- Time calculations and the clockt : minTime between two clock times, add time, and 1.75 h = 1 h 45 min for the timesheet.
- Slope and fall% · ° · 1:xFall from level to level, in per cent, per mille, degrees and mm per metre — and the height difference.