Skip to content
← Techniques

Building a cavity wall — from setting out to capping

Plumb line, gauge line, bond, ties and weep holes

The full work sequence for building a cavity wall, as described by Mur & Tag and DS/EN 1996-2: setting out, brick dimensions, mortar preparation, bond, joints and covering. Load-bearing cross-section, mortar class and wall tie capacity are verified by structural calculation — the guide covers execution, not design.

  1. Read the drawing and structural calculation

    Start by clarifying the unit type, the mortar's M class and the control class (reduced / normal / tightened) in accordance with DK NA:2019. These are load-bearing design choices — they are determined by the designer, not on site. Note that DS/EN 1996-3 (simplified methods) is NOT approved in Denmark and must not be used.

    StandardDS/EN 1996-1-1 + DK NA:2019Inspection classreduced / normal / tightened
  2. Set out plumb line, alignment and course line

    Set out the plumb line and wall line from the reference points and put up a course line. The course height is the brick height plus one bed joint — for Danish standard bricks (DF) with a 12 mm bed joint this is 66 mm per course (54 + 12). Build the corners first and stretch the line between them.

    Course height (DF)66 mm (54 + 12)Bed joint12 mm
  3. Start on the foundation with a damp-proof course

    The wall must start from the top of the foundation with the damp-proof course/moisture barrier correctly fitted, so rising damp is stopped from the first course. See the separate guide «Damp-proof course and moisture barrier» for the layer build-up.

  4. Mix mortar according to the M class

    Choose the mortar according to the project's M class (DS/EN 998-2). KC mix mortar is mixed according to Aalborg Portland's mixing tables; factory-made designed mortar is CE-marked with a DoP. See the guide «Mixing mortar on site» for the mixing itself.

    StandardDS/EN 998-2
  5. Lay bricks in bond with even joints

    Lay the bond consistently (stretcher, English or English cross bond as the design specifies), so that the perpends are offset from course to course. Keep the joints at the normal joint's nominal 12 mm — in normal inspection class the bed joint must be within 8–16 mm and the perpend joint within 8–20 mm (Mur & Tag based on DS/INF 167). Even joints give regular coursing and a calm brickwork appearance.

    Bed joint12 mm (8–16 mm)Perpend joint12 mm (8–20 mm)
  6. Fit wall ties evenly

    In cavity walls, fit a minimum of 4 corrosion-resistant wire ties per m², evenly distributed, with max. 400 mm spacing and extra ties along edges, openings and movement joints. The top row of ties is placed max. 200 mm from the top edge and is counted at 50 % reduced capacity.

    Cavity wallmin. 4 pcs/m²Max. distance400 mmTop rowmax. 200 mm from top edge

    The minimum number is a lower limit — number and capacity MUST always be verified by calculation for the actual wind load.

  7. Leave open perpends as weep holes

    Open perpends (weep holes) are placed directly on the damp-proof course in the outer leaf so any condensation or rainwater in the cavity can drain out. Take care that the weep holes are not blocked by mortar droppings during bricklaying.

  8. Check plumb, line and fall as you go

    Continuously check plumb, alignment, fall and joint width with a spirit level and gauge rod. Masonry is unforgiving — a facade out of plumb or joints of varying width are visible forever. Deviations are recorded and clarified with the designer.

  9. Cover the top at the end of work and in rain

    Cover the top of the fresh masonry at the end of work and in rain, so that the mortar is not washed out and does not run down the facade. Washout causes permanent discolouration and weakens the joints.

  10. Document in the QA package

    Complete the process control form (x.400) and process photo documentation (x.490) as you go, and record tolerances and deviations in the QA log (x.700). The documentation is the proof that the work has been carried out as agreed and to the standard.

    QA formsx.400 / x.490 / x.700

Source

Based on Discebo bricklaying «Checklist: building a cavity wall» and Mur & Tag (mur-tag.dk/udfoerelse/opmuring) and DS/EN 1996-1-1 + DK NA:2019.

Videos from NDLA

2

Video guide· Norwegian speech

Hugging av teglstein

Source

NDLA

«Hugging av teglstein» · Photographer: Frode Andre Sletholen · Supplier: John Gunnar Johnsrud

License: CC BY-SA 4.0 · Original at NDLA ↗

Shown unaltered in the original language with the source's own subtitles. The video shows Norwegian practice — the method is often the same, but rules and standards may differ from the Danish ones.

Previous and next