How compact must the gravel be — and why you order extra

2026-06-14·4 min reading

Loose soil and gravel settle when compacted. Here are NOVA 2015's requirements for the degree of compaction, how to check it on a small project, and why you must order more material than the finished layer takes up.

Introduction

When a layer of gravel or topsoil is laid loose and then compacted with a plate compactor or roller, it takes up less space than the loose material. If you order only the finished, compacted volume, you will end up short of material.

Loose goods(what you order)vibrates/drumCompressed(finished layer)sentence15–30 %order additional: gravel 15–35% · topsoil 20–30% (advisory)
Fig. Loose material takes up more space than the compacted layer — the difference (settlement) is the extra amount that must be ordered.

How compact must it be? (degree of compaction)

The degree of compaction tells you how densely the material is packed compared with the densest packing you can get with the same material in a laboratory test. The test is called the Proctor test. So 95% means the gravel is packed to 95% of what the laboratory could achieve. NOVA 2015 uses two kinds of test: standard Proctor (ramming) for clay soil and vibratory Proctor for gravel and sandy soil.

MaterialAverage / minimum per testTest
Stabilised gravel> 95 % / 92 %Vibratory Proctor
Frost protection gravel> 95 % / 92 %Vibratory Proctor
Subsoil, sandy> 95 % / 92 %Vibratory Proctor
Subsoil, clayey> 96 % / 93 %Standard Proctor
Stone and macadamCannot be measured — compact with heavy machinery until the stones are locked in place—

The figures are measured with a nuclear density gauge (an instrument lowered into the layer). Crushed concrete, brick and asphalt must have the same degree of compaction as stabilised gravel. The requirements for subsoil apply down to 2 metres below the finished surface.

The figures apply to roads. For small pavements with no risk of overloading you may go 2 percentage points lower, and for terraces 4 percentage points. NOVA itself states that there is no documentation for these values.

Checking on a small project

On a road, compaction is measured several times per control section. On a small project, the check may be based on process control: how big the machine is, how many times you pass over the layer, and simple tests. You compact until the plate compactor, the wheels or the tool no longer leave marks in the surface (NOVA 2015, pp. 66-67). Compaction works best when the gravel has the right moisture content and the machine suits the layer thickness.

The rest of the article is locked

Create a free user account to unlock all articles, calculators, templates and range — and get access to quizzes and classes. It takes less than a minute: name, email and a password. No payment card.

Want to try something first? See what you can use without an account — the junior zone, the encyclopedia, the videos and more.